I, as the chairman of Mai Khola Hydropower Pvt. Ltd, take great pride to work together with our team in hydropower

Super Mai Hydropower Limited
Super Mai HPP-7.8MW, Ilam

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

previous arrowprevious arrow
next arrownext arrow
PlayPause
Slider

Super-Mai hydropower project Company is established to develop hydropower managed by the team of diversified well experienced professionals, local and successful businessmen from various disciplines such as Hydropower Developers, Management, Financial Consultants, Engineering, Education, and Public Affairs committed to bring excellence in the corporate and public governance.

Super-Mai hydropower project Ltd. was established on the year of 2071, backed up by leading persons in hydropower developers, finance and industrial sector with the sole purpose of generating energy in safe, cost effective, reliable, efficient and environmentally sound manner using state of the art technologies. The Company aims to generate and supply energy from various sources, mainly by hydropower. In order to pursue this goal, the Company envisage to organize and utilized the financial and technical capabilities available within the country to construct projects one after another to contribute to whatever extent possible to the energy need of nation, and assure attractive return to the investors.

The first (pilot) project of Supar-Mai Hydropower Ltd. is Super-Mai hydropower project (7.8 Mw), which is now commissioning successfully. The Water from Mai Khola is diverted along right bank of Mai Khola to generate 45.91 GWh of energy. The generated energy from Switchyard is evacuated to Godak Sustation through 132 kv Panchakanya transmission by LILO arrangement.

Board of Directors

Award and Achievement: