Powerhouse

Powerhouse Type  :   Sub-Surface Powerhouse with 2 unit turbine Size  :  24.6 x 16.6 m Turbine Type  :  Francis No of Units  :  2

Headworks

Diversion weir/ Intake
Crest elevation of weir   :  825.5 amsl
Length of weir  : 50 m
Type of Weir  :   Boulder Lined Free Over Flow
Type of Intake  :  Side Intake
Depth of intake  :  1.5 m
Trash Rack  :  Coarse Trash Rack
Rack dimension  :  20mm thick, 50mm wide flat bar 10

Surge Tank

Type  :  Concrete Surge Tank Diameter  :  7.0 m Height   :  24 m

Settling Basin

No of Bay    :    2 nos. Type    :    Intermittent gravity flushing Inlet transition length   :    12.0 m Settling transition length   :   52.0 m Outlet transition length     :   10m Width   :   6.50m each Depth  &

Power and Energy

Power and energy   Gross head : 133.30 m Rated net head :  123.63 m Installed capacity :  7800.0 kW Dry season energy :   8.07  GWh Wet season energy :  37.84 GWh Annual energy :  45.91 GWh

General Info.

Location  :  Sumbek, Barbote, Soyang VDC
Project BoundaryLongitude – 87°56′27″ E to 87°58′00″ E     Latitude – 26°56′27″ N to 26°58′00″ 

Design Consultant

Units Engineering Consultany Pvt. Ltd.Kupondole, Kathmandu

EM Equipments

M/s Flovel India Pvt. Ltd.

Our Board of Directors

  • Mr. Mohan Bikram Karki

    Chairman
  • Mr. Madhav Prasad Mainali

    Managing Director
  • Mr. Rajendra Kumar BC

    Director
  • Mr. Buddhi Bahadur Karki

    Director
Message From Chairman
Image is not available

I, as the chairman of Mai Khola Hydropower Pvt. Ltd, take great pride to work together with our team in hydropower

Super Mai Hydropower Limited
Super Mai HPP-7.8MW, Ilam

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

Project : Super Mai HPP 7.8MW
Location : ilam, Nepal
Type : ROR, Rain fed, Perennial
Catchment Area: 163km2
Design discharge (Q40): 7.5 m3/s
Riparian release: 0.235 m3/s
Net Head: 124.62m
Dry season energy: 8.334 GWh
Wet season energy: 39.063 GWh

previous arrowprevious arrow
next arrownext arrow
PlayPause
Slider

Apply for Vacancy

Looking for oppoutunity?

You can connect us by filling this form. We will try to get back to you as soon as possible.