Super Mai Hydropower Pvt Ltd starts trial production
https://en.setopati.com/market/132269
Powerhouse Type : Sub-Surface Powerhouse with 2 unit turbine Size : 24.6 x 16.6 m Turbine Type : Francis No of Units : 2
Diversion weir/ Intake
Crest elevation of weir : 825.5 amsl
Length of weir : 50 m
Type of Weir : Boulder Lined Free Over Flow
Type of Intake : Side Intake
Depth of intake : 1.5 m
Trash Rack : Coarse Trash Rack
Rack dimension : 20mm thick, 50mm wide flat bar 10
Type : Concrete Surge Tank Diameter : 7.0 m Height : 24 m
No of Bay : 2 nos. Type : Intermittent gravity flushing Inlet transition length : 12.0 m Settling transition length : 52.0 m Outlet transition length : 10m Width : 6.50m each Depth &
Power and energy Gross head : 133.30 m Rated net head : 123.63 m Installed capacity : 7800.0 kW Dry season energy : 8.07 GWh Wet season energy : 37.84 GWh Annual energy : 45.91 GWh
Location : Sumbek, Barbote, Soyang VDC
Project BoundaryLongitude – 87°56′27″ E to 87°58′00″ E Latitude – 26°56′27″ N to 26°58′00″
Units Engineering Consultany Pvt. Ltd.Kupondole, Kathmandu
M/s Flovel India Pvt. Ltd.
https://en.setopati.com/market/132269
-RSS The Super Mai Hydro Pvt. Ltd. operated in Ilam has
Power and energy Gross head : 133.30 m
Type : Concrete Surge Tank Diameter :&nbs